Boil-off test

The 'boil-off test' service function must be used to check the boil-off system at regular intervals.

Running the test

Precondition

The following requirements must be met for the boil-off test to be run by the CE module:

Running the test

After the test start, the following sequence is run:

Test result

If a fault occurs, fault information is displayed.

If the fault ”boil-off valve does not open” occurs, the crack-off pressure of the boil-off valve must be checked. If necessary, replace the boil-off valve.

Any other faults that occur lead to storage of a fault code memory entry in the fault code memory of the CE module. Troubleshooting continues with the following test modules:

The test modules are adopted automatically into the test plan if a corresponding fault is determined.

Test abort

If the test sequence is aborted due to a fault, the boil-off test activated in the CE module must be completed as follows:

For this reason, the service function must be run to the end in all cases!

Shortened test sequence

If it is determined at the start of the service function that the boil-off system is already active, the oxidant temperature is monitored immediately.